Hi Gurus,
We're facing problem with the dates in the Interaction Center SAP CRM 7.0. Into the Sales Order we have the Request Delivery Date.
Now we have a copy of a standar date profile "000000000004" with a date type "REQ_DLV_DATE" (Rqstd Delivery Date Prop-- Order Hdr).
The field must determine the dates automatically (today + 1 day) with the posibility to enter manually the dates.
When the user modify the date, the system in UI (web) save the date correctly, but when you look the date into SAP CRM GUI the date is different, the system takes the date profile determination (today + 1 day).
Thanks for your help.
MC.