hi,
I got a problem here with the product change functionality. I will try to explain the problem
when i am try to product change the line item of the first product was ended with the earlier date of the second line item date.
the first line item product status :ended and
the second one status is:accept
but the thing is the first line item status was still in "LIVE" how can i fix the problem.